|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Tye Bar Between Rear Pin Sockets |
|
Tye bar made up prior to installation. I am not carrying out the instalation section of the wings as per the manual, and this is why the tye bar has already been drilled off and the fittings installed. |
|
|
|
|
|
|
|
|
|
|
|
|
New Rear Starboard Hard Point |
|
New replacement hard point trial fitted. |
|
|
|
|
|
|
|
|
|
|
New Rear Starboard Hard Point |
|
New replacement hard point trial fitted. |
|
|
|
|
|
|
|
|
|
|
Port Side Rear Hard Point |
|
New hard point installed on bed of flox and one layer of bid cloth overlapping the hard point insert by a minimum of 50mm all over. |
|
|
|
|
|
|
|
|
|
|
Port Side Completed Hard Point |
|
Peel Ply removed to show replacement hard point and layup. |
|
|
|
|
|
|
|
|
|
|
Starboard Side Rear Hard Point |
|
New hard point installed on bed of flox and one layer of bid cloth overlapping the hard point insert by a minimum of 50mm all over. |
|
|
|
|
|
|
|
|
|
|
Starboard Side Completed Hard Point |
|
Peel Ply removed to show replacement hard point and layup. |
|
|
|
|
|
|
|
|
|
|
Starboard Side Completed Hard Point |
|
Peel Ply removed to show replacement hard point and layup.
|
|
|
|
|
|
|
|
|
|
|
New Starboard Front Hard Point |
|
New hard point installed on a bed of flox and covered with one layer of BID cloth and then peel ply |
|
|
|
|
|
|
|
|
|
|
New Starboard Front Hard Point |
|
Finished replacment hard point. |
|
|
|
|
|
|
|
|
|
|
New Port Front Hard Point |
|
New hard point installed on a bed of flox and covered with one layer of BID cloth and then peel ply. |
|
|
|
|
|
|
|
|
|
|
New Port Front Hard Point |
|
Finished replacment hard point. |
|
|
|
|
|
|
|