|
|
|
|
|
|
|
Port Leg Gear Socket Bay |
|
All layups completed |
|
|
|
|
|
|
|
|
|
|
Starboard Leg Gear Socket Bay |
|
All layups completed |
|
|
|
|
|
|
|
|
|
|
Gear Leg Sockets |
|
Leg sockets showing knurled finish in preference to dimpling. |
|
|
|
|
|
|
|
|
|
|
Port Gear leg Socket |
|
Gear leg socket installed with redux underneath base. |
|
|
|
|
|
|
|
|
|
|
Starboard leg Socket |
|
Trial fit of starboard leg socket. |
|
|
|
|
|
|
|
|
|
|
Port Leg |
|
Image looking forward showing port leg clamped to a piece of angle iron. |
|
|
|
|
|
|
|
|
|
|
Port Leg |
|
Image looking backwards showing port leg clamped to a piece of angle iron. |
|
|
|
|
|
|
|
|
|
|
Starboard Leg |
|
Image looking backwards showing starboard leg clamped to a piece of angle iron. |
|
|
|
|
|
|
|
|
|
|
Port Leg |
|
Close up of port leg showing it clamped against the stop. |
|
|
|
|
|
|
|
|
|
|
Port Leg Gear Socket Bay |
|
Rib one installed with redux on port side leg socket |
|
|
|
|
|
|
|
|
|
|
Port Leg Gear Socket Bay |
|
Ribs 1 and 2 installed with fibreglass layups. Ribs 3 and 4 bonded in with Redux. |
|
|
|
|
|
|
|
|
|
|
Port Leg Gear Socket Bay
|
|
Ribs 1 and 2 installed with fibreglass layups. Ribs 3 and 4 bonded in with Redux. |
|
|
|
|
|
|
|
|
|
|
Starboard Leg Gear Socket Bay |
|
Ribs 1 installed with fibreglass layups, rib 2 bonded in to position. |
|
|
|
|
|
|
|
|
|
|
Starboard Leg Gear Socket Bay |
|
Ribs 1 installed with fibreglass layups, rib 2 bonded in to position. |
|
|
|
|
|
|
|
|
|
|
Starboard 3 and 4 Ribs |
|
Ribs made and installed prior to bonding in with Redux. |
|
|
|
|
|
|
|
|
|
|
Starboard 3 and 4 Ribs
|
|
Ribs made and installed prior to bonding in with Redux. |
|
|
|
|
|
|
|
|
|
|
Starboard Leg Socket |
|
Outer layup on the underside of the fuselage over the base of the leg socket. |
|
|
|
|
|
|
|
|
|
|
Port Leg Socket |
|
Outer layup on the underside of the fuselage over the base of the leg socket. |
|
|
|
|
|
|
|
|
|
|
Nose Gear Friction Washers |
|
I had to make a spacer ring as the nose leg spidle was 1/16" to long which meant the beleville sprung washers would not apply tension on the nose gear leg frame. |
|
|
|
|
|
|
|